Pupu Hydro Walkway
Description
Sound of water running along a water race, that was built as a part of a gold mining operation and now used for the Pupu Hydro Power Scheme, which provides power to Takaka, in Golden Bay, New Zealand.
Technical Details
Format
WAV
Sample Rate
44100 Hz
Bit Depth
16 bit
Bitrate
320 kbps
Channels
Stereo
File Size
0 bytes